All tools
Real Estate & Finance

FSI / FAR & Coverage

Permissible built-up area, ground coverage and setback check.

Inputs

Results

Enter your values, then press Calculate Now to evaluate the output.

Guide — FSI / FAR & Coverage

The FSI and FAR calculator below follows standard Indian construction practice and the relevant IS-code conventions. Enter the site dimensions exactly as measured, press Calculate Now, then refine the quantities line by line in the live sheet before you export.

Floor space index is the ratio of total built-up area to plot area. A 300 m² plot with FSI 1.8 permits 540 m² of construction, distributed across any number of floors subject to height and coverage limits.

Ground coverage limits the footprint independently of FSI. Even with generous FSI, a 60% coverage rule forces you to build taller rather than wider, and setbacks further reduce the usable footprint.

Most municipalities exclude stilt parking, staircases, lift wells and service ducts from FSI, and several allow premium or TDR-based FSI above the base entitlement at a fee. Check the current development control regulations before you finalise the plan.

Treat every output as an indicative pre-tender estimate. Site conditions, wastage allowances, specification changes and local market rates all move the final figure, so validate against your drawings and approved rate analysis before procurement.

Master Measurement Sheet

Sr. No.DescriptionUnitNOS 1NOS 2LBDQTYAction
11.000
Total CUM
1.000

Ratings & reviews

What engineers say about the FSI / FAR & Coverage.

No ratings yet
0 reviews

Leave a review

Sign in to rate this calculator. Reviews are published after moderation.

Loading reviews…

About the FSI / FAR & Coverage

This tool is built for site engineers, quantity surveyors, contractors and property investors who need dependable numbers fast. Every input is reactive — changing a single field instantly recomputes the full output set, so you can run sensitivity checks on dimensions, grades and rates before committing to an estimate.

Keep unit consistency in mind: metric inputs (metres, square metres, cubic metres) produce metric outputs, with imperial and Indian trade units shown alongside where they are commonly used on site.

Frequently asked questions

Related calculators